青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
If there is bleeding surface phenomenon, immediately jetting silt (= 1:1 cement: sand) dry mixing sand, spread evenly, thickness consistency, wood trowel pressure when rubbing force, so closely integrated with the concrete surface as as a whole.
If the pavement bleeding phenomenon, to sub immediately cemented Sands (1:1= cement: sand) dry mix sand, sub homogeneous, thick-consistency, when wood rubbed to hard concrete surface layer and closely integrated into the overall.
If the surface layer has the weeping phenomenon, must scatter the water silt immediately (the 1:1= cement: The granulated substance) mixes the granulated substance dryly, scatters, thickness evenly is consistent, the wooden trowel rubs the hands presses when must make an effort, to cause the surface
If there is a pil surface water immediately, to sub-Saharan water fill silt (1: 1 =cement mixing dry sand): sand, sub-Saharan evenly, thick, wooden towel rub son when putting pressure on the surface layer to effortlessly, closely integrated with concrete overall.
If the pavement bleeding phenomenon, to sub immediately cemented Sands (1:1= cement: sand) dry mix sand, sub homogeneous, thick-consistency, when wood rubbed to hard concrete surface layer and closely integrated into the overall.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]