青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Abstract: According to the cost of the project based approach to foreign aid and provisions, with the aid reconstruction project in Kathmandu, Nepal actual situation within the loop, described the preparation of Nepal's road project cost characteristics, precautions, and related factors, as more sci
Abstract: this article in accordance with national provisions on foreign aid project cost method of drawing up and, combined with aid Nepal Kathmandu ring road reconstruction project reality, described Nepal characteristics, prepared by the highway engineering cost considerations and relevant influe
Abstract: This article according to the national related aid to foreign countries project construction cost establishment means and the stipulation, the union helps the Nepalese Katmandu inner ring road transformation project actual situation, elaborated the Nepal highway engineering construction co
Summary: This article in accordance with the relevant national aid projects costing methodology and provides aid Kathmandu, Nepal, in conjunction with the inner ring road, on the actual transformation project Nepal highway construction cost features, notes the preparation and the relevant factors, t
Abstract: this article in accordance with national provisions on foreign aid project cost method of drawing up and, combined with aid Nepal Kathmandu ring road reconstruction project reality, described Nepal characteristics, prepared by the highway engineering cost considerations and relevant influe
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]