青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
To confirm the following with the site master valve is turned off, before and after the shut-off valve open, Vice-line valve closed.
Master site to verify that the following control valve is turned off, cut off the valve is open before and after, byline valve closes.
Master control with the scene must confirm following regulating valve is at the off-position, around the trip valve opens, vice-line valve closure.
正在翻译,请等待...
Master site to verify that the following control valve is turned off, cut off the valve is open before and after, byline valve closes.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]