青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
正在翻译,请等待...
As the mining and other large projects of large scale topographic surveying and mapping on the rise, usually used in the actual work of engineering control network is national unity coordinates. National control network projection is too wide, leading to the true length of the edge of the control ne
And so on the big-scale work big scale terrain mapping increases gradually along with the mine, when practical work the project control net uses is usually the national unified coordinates.Because the national control net throws the shadow band width, causes the control net each side true length cha
正在翻译,请等待...
As the mining and other large projects of large scale topographic surveying and mapping on the rise, usually used in the actual work of engineering control network is national unity coordinates. National control network projection is too wide, leading to the true length of the edge of the control ne
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]