青云英语翻译
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
[translate] Device by the heat pipe economizer soot and soot blower built-in compressed air system components, built-in six groups blowing soot blower tube, the connection shown in Figure 1. By the compressed air hose blowing pipe mains are connected with each group. Compressed air pressure must be not less tha
Heat pipe economizers ash blowing device consists of a built-in type soot and compressed air systems, built-in soot-a total of 6 groups of soot blowing tube, how they are connected as shown in Figure 1. Separately by hose for compressed air duct with each set of soot blowing tube connections. Compre
The heat pipe economizer easy installment is composed by the integral soot blower and the pneumatic system, the integral soot blower altogether has 6 groups of easy tubes, its connection way as shown in Figure 1.By hose compressed air main pipe separately with each group of easy pipe couplings.The c
正在翻译,请等待...
Heat pipe economizers ash blowing device consists of a built-in type soot and compressed air systems, built-in soot-a total of 6 groups of soot blowing tube, how they are connected as shown in Figure 1. Separately by hose for compressed air duct with each set of soot blowing tube connections. Compre
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]