青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
正在翻译,请等待...
Before and after the implementation of the programme through the detection and analysis of the effectiveness, power factor of the test result showed that up to 10,000-volt line (up to 0.94), improves voltage stability.
Through carries on the examination and the analysis to around the plan implementation effect, the actual result indicated enhanced 10 kilovolt line power factor (to achieve above 0.94), improved the voltage stability.
Through the implementation of the program for testing and analysis before and after results of actual test results, indicating the power factor (up to 10,000 volts lines above 0.94 ) to improve the voltage stability.
Before and after the implementation of the programme through the detection and analysis of the effectiveness, power factor of the test result showed that up to 10,000-volt line (up to 0.94), improves voltage stability.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]