青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Removal of elements: Stent removal of part of the level rod and scissors, after removal of the template and floor beam connection angle mode and the beam side of the template.
Demolition: dismantling support part of the horizontal lever and X-brace, demolition beams and floor slabs after side of the connection point mode and beam template template.
Demolition main point: The demolition support part horizontal tension bar and the scissors brace, latter demolishes Liang and the floor template contiguous angle mold and the Liang side template.
Stent removal: Removal of points level trolley and scissors, shoring Leung and 50,730 dismantled after the connection point template model and Leung side templates.
Demolition: dismantling support part of the horizontal lever and X-brace, demolition beams and floor slabs after side of the connection point mode and beam template template.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]