青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Tied at the end of die rolled steel, the acceptance, clearing debris, installing beam side of the template, with beam clamps or locking Lenz and installed outside the upper and lower vertical flute, accompanied by bracing, the spacing is generally desirable for 75cm. When the beam more than 60cm hig
At the end of all around die-rolled reinforced bar, after acceptance, clearing debris, installing beam side-template, or install the upper and lower lock Leng and beam clamp external vertical flute, with braces, spacing should be 75cm. When the beam is over 60cm, the extra lumbar taken aback, and we
正在翻译,请等待...
正在翻译,请等待...
At the end of all around die-rolled reinforced bar, after acceptance, clearing debris, installing beam side-template, or install the upper and lower lock Leng and beam clamp external vertical flute, with braces, spacing should be 75cm. When the beam is over 60cm, the extra lumbar taken aback, and we
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]