青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Construction process: 150 buried in the thick stone ram ---> 300 thick graded sand filled artificial cushion for formwork --- --- steel fiber floor and the wall, between columns of treatment (with walls of reinforced concrete column processing) --- 100 --- thick cushion c15 concrete pouring concr
Construction process: 150 thick gravel ramming into in the--->300 thick artificial for filled level distribution gravel pad layer---support die---steel fiber to ping and wall, and column between of processing (reinforced concrete and wall column processing)---100 thick C15 pigment concrete pad la
正在翻译,请等待...
正在翻译,请等待...
Construction process: 150 thick gravel ramming into in the--->300 thick artificial for filled level distribution gravel pad layer---support die---steel fiber to ping and wall, and column between of processing (reinforced concrete and wall column processing)---100 thick C15 pigment concrete pad la
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]