青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Construction team based on the information, the installation team for the base level elevation, axis, intervals and retest. In line with national standards before the next procedure. And two in the base surface of the vertical and horizontal axes indicate the cross line, column installation position
Basis of civil engineering-related information, install Team Foundation level elevation, axis, spaced repetition. Meet national norms before the next operation. And in the underlying surface marked with a vertical and horizontal cross the line of intersection of the two axis, as locating Datum of po
Basis of civil engineering-related information, install Team Foundation level elevation, axis, spaced repetition. Meet national norms before the next operation. And in the underlying surface marked with a vertical and horizontal cross the line of intersection of the two axis, as locating Datum of po
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]