青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Construction team should install the team the following information: the basis of concrete grade; compaction of backfill around the foundation; base axis mark, elevation reference points; each base axis offset; base elevation of each deviation; anchor bolt threads to protect the situation.
Civil engineering team should be installed to provide the following information: basic concrete grade infrastructure around backfill tamping; basic marks of an axis, elevation datum point; each basic axis offset; each base elevation deviation; anchor bolt thread protection.
正在翻译,请等待...
正在翻译,请等待...
Civil engineering team should be installed to provide the following information: basic concrete grade infrastructure around backfill tamping; basic marks of an axis, elevation datum point; each basic axis offset; each base elevation deviation; anchor bolt thread protection.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]