青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Taking into account the proposed location of the project relatively shallow water, soil nail wall construction in the surface layer is greater than the length of each 4m2 insert 500mm, diameter loomm of pvc pipes, drain pipe mouth tilt downward.
Comparison of water level taking into account the location of the proposed works and shallow soil-nailing wall construction of surface layer in each 4m2 longer than PVC drainage pipe of diameter of 500mm, lOOmm, tilt down drain piping nozzle.
Considered plans to construct the project locus the water level quite to be shallow, in the earth nail wall construction is bigger than 500mm, the diameter lOOmm PVC discharge pipe downward in the surface layer each 4m2 insertion length, the drain pipe orifice incline.
正在翻译,请等待...
Comparison of water level taking into account the location of the proposed works and shallow soil-nailing wall construction of surface layer in each 4m2 longer than PVC drainage pipe of diameter of 500mm, lOOmm, tilt down drain piping nozzle.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]