青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
When drilling to ensure that position, to prevent uneven and cross-level; drilling, drilling more than the design depth of 100-200mm, to prevent deep enough; anchor made by the hand, for the bolt holes placed The center should be set at 1500mm anchor locator on every one, should be placed immediatel
Drilling Shi to guarantee location, prevent high and low uneven and mutual staggered; drilling Shi to than design depth more drilling 100-200mm, to prevent depth enough; anchor Rod should by hand making, for makes anchor Rod placed drilling of Center, should in anchor Rod Shang each across 1500mm se
正在翻译,请等待...
正在翻译,请等待...
Drilling Shi to guarantee location, prevent high and low uneven and mutual staggered; drilling Shi to than design depth more drilling 100-200mm, to prevent depth enough; anchor Rod should by hand making, for makes anchor Rod placed drilling of Center, should in anchor Rod Shang each across 1500mm se
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]