青云英语翻译
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
[translate] 正在翻译,请等待...
After the "85" "95" scientific and technological research projects such as planning, in April 2002, the trend of the first experimental power station installed capacity (70-kilowatt) built in daishan Zhoushan Zhejiang Kameyama waterways.
After “85” “95” technical attack research projects and so on the plan, in April, 2002, our country first tidal current tested the power plant installed capacity (70 kilowatts) to complete in the Zhejiang Province Zhoushan Dai county Guishan canal.
After the " 85" " 95" science & technology project planning, such as research projects, in April 2002, my first block, experimental station trend installed capacity (70,000 KW) in Zhoushan City Zhejiang Province County built kameyama watercourses.
After the "85" "95" scientific and technological research projects such as planning, in April 2002, the trend of the first experimental power station installed capacity (70-kilowatt) built in daishan Zhoushan Zhejiang Kameyama waterways.
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]
[translate]