青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
To reduce costs, control quality and stable delivery, Xin Yun Sheng factory with raw materials production, deployment and plastic products sub-branch
Delivery to reduce costs, control quality and stability, Xin Yun sheng has a production plant, provisioning branch and injection products
In order to reduce the cost, the control quality and the stable delivery date, Xin Jun is equipped with the material production branch factory abundantly, mixes the branch factory and the injection molding product minute
To reduce the cost, quality control and stability, and for the production of raw materials which Teresa Mo sheng equipped with factory, deployment and injection molding products factory
Delivery to reduce costs, control quality and stability, Xin Yun sheng has a production plant, provisioning branch and injection products
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]