青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Peat, silt, frozen, strong expansive soil, soil organic matter and soluble salt content of the soil than allowed, etc., shall not be directly used for filling the roadbed. Frozen regions of the road bed and flooded part of the silty soil embankment filling should not be used directly.
Peat, silt, frozen soils, strong expansion exceeds the allowable soil, organic matter and soluble salt content of soil, and so on, shall not be directly used for filling roadbed. Petrol-driven road beds frozen regions and sections not be directly filled silty soil in embankment.
正在翻译,请等待...
PEAT, silt, clay, geocryology, strong swelling clay and organic matter content of soluble salts exceed the permitted land reclamation, and so on, may not be used directly for 11,236 . Frozen parts of the road bed and flooded part embankment should not be used directly to reclaim powder quality.
Peat, silt, frozen soils, strong expansion exceeds the allowable soil, organic matter and soluble salt content of soil, and so on, shall not be directly used for filling roadbed. Petrol-driven road beds frozen regions and sections not be directly filled silty soil in embankment.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]