青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
3, the design traffic forecasts should take full account of the corridor with a range of long-term social and economic development and the impact of an integrated transport system.
3, design, traffic volume forecasting should take full account of long-term social and economic development within the corridor and the impact of integrated transportation system.
3rd, the design volume of traffic forecast should consider in fully the corridor belt scope forward social, the economical development and the synthesis transportation system influence.
3, design traffic forecast should be fully taken into account along corridors within the context of long-term social and economic development and integrated transport system.
3, design, traffic volume forecasting should take full account of long-term social and economic development within the corridor and the impact of integrated transportation system.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]