青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
For the bridge of the bridge passes through the deck and the bracket connecting the power and load design requirements should be broken down into the vertical pitch, lateral pitch and vertical pitch.
For skew bridge, bridge passes through the deck to the connection and the force of scaffold should be broken down into design and loading requirements of the vertical part, lateral and vertical zoning power.
Regarding the hoist incline, the bridge transmits through the floor system for the connection and the support strength and the load should decompose into the design request vertical force component, the lateral force component and the longitudinal force component.
正在翻译,请等待...
For skew bridge, bridge passes through the deck to the connection and the force of scaffold should be broken down into design and loading requirements of the vertical part, lateral and vertical zoning power.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]