青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
We hope that in the location shown in the figure grounding system installation process of grounding. The construction may take 10mX1m green area. We will be in the position of the vertical interval of 5m Buried three 2.5m long steel and flat steel used as a grounding connection.
We hope that in the figure shown in the location grounding prong grounding system installation process. 10mX1m may be consumed when the construction area of green space. We will be in the interval 5m vertical buried 3 2.5m length of steel pipe with flat steel joins as a grounding electrode.
We hoped shows the position in the chart to install the craft earth system the earthed pole.When this project construction possibly can take the 10mX1m region the green space.We will be separated in this position 5m vertical darkly to bury 3 2.5m long steel pipes and to take the earthed pole with th
We hope that the installation location shown in the map of an earth electrode craft grounding system. When the construction of the project may be occupied by region 10 mX 1m green. We will be at 5m vertical interval between the location and buried 3 2.5 m long steel tube and used flat steel as an ea
We hope that in the figure shown in the location grounding prong grounding system installation process. 10mX1m may be consumed when the construction area of green space. We will be in the interval 5m vertical buried 3 2.5m length of steel pipe with flat steel joins as a grounding electrode.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]