青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
正在翻译,请等待...
4. welding cell anode, secondary four points; welding press on after the opening, with two 15mm on the yellow tape to secure the Thermistor in the cell;
4. welds receives a telegram the core cathode, two four; After welds opens the briquetting, fixes with two 15mm long yellow adhesive tapes Thermistor on the electricity core;
4) welding batteries 2 times, and negative terminal 4 opened after a good point; welding pressure on Block 15 mm long, with two yellow tape Thermistor will be fixed in batteries;
4. welding cell anode, secondary four points; welding press on after the opening, with two 15mm on the yellow tape to secure the Thermistor in the cell;
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]