青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
High operating basket by the structure of the new suspension design and calculation of body, optimizing wire connection points, before and after the suspension of the institutions to improve the finite element analysis.
Temporarily installed suspended access by height and structure design and calculation of new type of hanging, optimized wire rope connection points, on the improvement of finite element analysis of front and rear suspensions.
Around through to the high place work hanging basket new hand organization structural design computation, the optimized steel wire junction, to improved the hand organization to carry on the finite element analysis.
Through the operation of high-flying bodies hanging baskets, and optimization of the structural design calculations, steel wire rope connection point to improve both before and after flying bodies of finite element analysis has been carried out.
Temporarily installed suspended access by height and structure design and calculation of new type of hanging, optimized wire rope connection points, on the improvement of finite element analysis of front and rear suspensions.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]