青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Gate to the measurement of 208 new Audi T99 coating on the ground in charge of Road site from the ground distance, the spacing between the pipes. Main channel supporting frames of size, the distance between each supporting frames.
Measuring Gate No. 208 to the Audi T99 painting on the new site ground distance on the main pipeline from the ground, space between the pipe. The main pipe support frame sizes, distance between each bracket.
Surveys 208 gates to paint in the newly built work site ground to Audi T99 the main pipe line to be apart from in the ground the distance, between the pipeline spacing.Main pipe line carriage size, between each carriage distance.
Measuring 208, audi T door-to 99 coating new site on the ground away from the road on the ground, the distance between the spacing between channels. the supporting structure, size of the distance between each of the supporting structure.
Measuring Gate No. 208 to the Audi T99 painting on the new site ground distance on the main pipeline from the ground, space between the pipe. The main pipe support frame sizes, distance between each bracket.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]