青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
正在翻译,请等待...
General scaffolding erection using φ 48x3.5 double fastener steel pipe scaffolding, steel pipe from the wall on the inside 500mm, double exhaust pipe between 1000mm, 1200mm riser spacing, horizontal tube spacing is 1500mm, shear braces required. Riser cushion at the bottom to prevent sinking. ...
The ordinary scaffold puts up uses φ48×3.5 the two-row to buckle the steel pipe scaffold, the inside steel pipe to wall 500mm, between the two-row steel pipe is separated by 1000mm, the pipe riser spacing is 1200mm, the crossing canal spacing is 1500mm, according to request establishment shearing fo
The scaffold should be set up with 48 X 3.5 double-pipe scaffolding is on the inside, away from the wall 500mm tubes, and double-row between 1000 mm steel pipe, pipe spacing is 1200 mm, the cross pipe spacing is 1500 mm, the shear force required. The cushioned bottom risers to prevent sinking. . . .
General scaffolding erection using φ 48x3.5 double fastener steel pipe scaffolding, steel pipe from the wall on the inside 500mm, double exhaust pipe between 1000mm, 1200mm riser spacing, horizontal tube spacing is 1500mm, shear braces required. Riser cushion at the bottom to prevent sinking. ...
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]