青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Set the top of the pile in Pile 0.5m thick raft, raft width of 14m, the use of c30 concrete pouring.
Pile raft thickness of pile top set 0.5M, mat 14m, C30 concrete placement.
Establishes the 0.5m thick raft board in the steel pipe driven in as piling head of pile, raft board width 14m, uses the C30 concrete construction to become.
In the case of the pile top set 0.5 m thick raft Board, Board width 14 M craft, with 30 C concrete-pouring.
Pile raft thickness of pile top set 0.5M, mat 14m, C30 concrete placement.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]