青云英语翻译

选择语言:从 语种互换 检测语种 复制文本 粘贴文本 清空文本 百度查找
翻译结果1翻译结果2翻译结果3翻译结果4翻译结果5
Final selection of the structural design drawings, typical stairs, floors and two consecutive sub-beams, the main consideration of vertical dead load and live load, component size on the drawings, the internal force computation and reinforcement checking, drawing reinforcement chart.
Structure design of the last selected drawings, typical stair, floor and beam two consecutive times, the main considerations of vertical dead load and live load, according to the drawings on the widget size, calculation and reinforcement calculation of internal forces, a reinforcement chart.
Finally designated the structural design blueprint, the typical staircase, the floor and two continual secondary girders, the main consideration vertical dead load and the live load, according to the blueprint on component size, carry on the endogenic force computation with to match the muscle check
Finally selected structural design drawings, a typical floor staircase, and two consecutive times, the main vertical frame to hang out and live according to the drawing board, the component size, competitiveness in computing and the Web, and then draw the tendon.
Structure design of the last selected drawings, typical stair, floor and beam two consecutive times, the main considerations of vertical dead load and live load, according to the drawings on the widget size, calculation and reinforcement calculation of internal forces, a reinforcement chart.
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate] 
[translate]